To get a complete picture of their water use, data centres must account for both onsite water use and the water used elsewhere to generate the power they need.
- Ph.D Student, College of Engineering, University of Saskatchewan
Contact Corwyn for
- General
- Location: Saskatoon
- LinkedIn: https://www.linkedin.com/in/corwyn-shomachuk-889890bb/
- Article Feed
-
- Joined